TAEJIN METAL TJM Request a Quote
Home / Equipment

Equipment

Material up to 6 mm thick, 27 presses from 150T to 400T, a 1,500L washer at Seongju Plant 2, and die development with our partner maker.

SPECIFICATION

Forming Capacity

These are the figures buyers check first. If your part falls outside this range, send the drawing anyway and we will review feasibility.

Material thickness
Up to 6 mm
Press capacity
150T ~ 400T (incl. two 250T double presses)
Units
27 presses (Plant 1: 13 · Plant 2: 14)
Secondary process
Washing, drying, insulation bonding, inspection, packing
Machining
Lathe, milling, radial drill, argon welding
DIE

Die Development & Modification

Programs without an existing die are welcome. We develop dies from design through build with a die maker we have worked with for years, and manage the die ourselves once production starts.

New dies
Designed and built with our partner die maker
Modification
Existing dies modified and repaired, jointly with our partner where the scope requires
Transfer
Dies transferred from other suppliers, including first-article inspection
History
Die history tracked per part number with repair and change records
Patent
Press die setting structure (No. 10-1427991)
PLANT 01

Seongseo Plant 1

2,000㎡, centered on a 250T 5-station robotic line producing body parts.

Automatic feeding line at Seongseo Plant 1 Measuring and testing equipment

Press Equipment

13 units
EquipmentCapacityMakerDie height (mm)Qty
Mechanical Double Press250T—500~3801
Mechanical Press250TMIDA550~4001
Mechanical Press250TWOOJIN550~4001
Mechanical Press200TMIDA550~4001
Mechanical Press200TWOOJIN480~3602
Mechanical Press200TWOOJIN450~3503
Mechanical Press160TMIDA550~4002
Mechanical Press150TWOOJIN480~3602

Automation

N/C leveler feeder 6.0×600 (SHINMYUNG) ×2
Robot system and line auxiliaries

Machining & Inspection

Lathe, milling, radial drill, argon welder — 8 units
Height gauge, surface plate, tensile tester, self-check stations

PLANT 02

Seongju Plant 2

4,900㎡, running a 400T press line and an exhaust-part insulation bonding line.

Press line at Seongju Plant 2

Press Equipment

14 units
EquipmentCapacityMakerDie height (mm)Qty
Mechanical Press400TSIMPAC600~4501
Mechanical Double Press250TSIMPAC550~3801
Mechanical Press200TSIMPAC500~4002
Mechanical Press200TBOCHANG500~3802
Mechanical Press200TBOCHANG500~4001
Mechanical Press200THANEOL550~4001
Mechanical Press160THANEOL500~4004
Mechanical Press150TBOCHANG500~4001
Mechanical Press110TWOOJIN380~2801
WASHING

Washing Line

Seongju Plant 2 operates a 1,500L washer. Process oil and contaminants are removed before shipment, so lead times are shorter than outsourced washing and quality control stays in one place.

Equipment
1,500L washer (TAESUNG ENG) ×1
Method
Basket immersion washing, hoist transfer
Downstream
Drying, inspection and packing handled in-house
Lifting a parts basket from the 1,500L washer